103. Construction or demolition waste landfills referred to in the second paragraph of section 102 may be established or enlarged only for the purpose of filling a pit or quarry within the meaning of the Regulation respecting pits and quarries (chapter Q-2, r. 7) if the depth of the pit or quarry allows for waste to be landfilled to an average thickness of at least 3 m.
Only construction or demolition waste within the meaning of section 101 of this Regulation may be disposed of in a landfill referred to in the first paragraph.